A prototype system is available at its Thane Factory where trials can be conducted to determine feasibility, and equipment with guaranteed performance can be offered.


LAB SET UP

Wiped Film Evaporator
Size M.O.C Qty. Required For Trial Qty. Of Tamples Required For Testing Pressure Rating Remarks
0.45 m² SS-316 50 to 100 litres 200 Ltrs. Shell- Full vacuum Jacket – 6 kg/cm²g (steam) Typical throughput for aqueous material is about 60 to 100 kg/hr.
Parameters
Vacuum – water Ring vacuum pump at approx. 700 mm Hg. Piston Pump with Booster – 0.5 mm Hg A.
Hot Media – Steam Heating – 100 to 180 ºC or Hot Oil Heating range 100 to 320 ºC
Cooling Media – Cooling Tower Water
ATFD
Size M.O.C Qty. Required For Trial Qty. Of Tamples Required For Testing Pressure Rating Remarks
0.5m² SS-316 30 – 50 ltr/hr. 200 Ltrs. Shell- Full vacuum Jacket – 6 kg/cm²g (steam) Typical throughput for aqueous material is about 30 to 60 kg/hr.
Vibro Energy Seperators
Size M.O.C Qty. Required For Trial Qty. Of Tamples Required For Testing Pressure Rating Remarks
19” dia SS-304 30 lit 20 to 50 kgs Meshes from 1/2” to 350 available. Throughput is in the region of 50 to 100 kg/hr depending upon particle size distribution.


Utilities Steam Boiler : 200 kg / hr, 6 kg / cm2g
Hot water Hot water circulation system is available with appropriate pump and temperature control.
Thermopack Suitable for, 320°C.
Vacuum a) 100 m²/hr. double stage water ring vacuum pump with air jet booster.
b) 100 m3/hr oil seal vacuum pump.
c) 125 m3/hr Rotary piston pump.
d) 10000 m3/hr Booster roots blower.
Cooling water a) Water at ambient temperature from cooling tower.
b) We can arrange chilled water circulation between 8 to 12° C for condensation of lower boiling materials.